Syed Faiz E Hassan Naqvi
General Information
- Address 276 G4 block , wapda town Lahore
- Job Locations 15-25 Hogarth Rd, London, United Kingdom, Ajman, United Arab Emirates, Australia, Canada, Europe Countries
- Job Category Construction, Electricity, Energy, Engineering
- Language Urdu, English, Punjabi
- Highest Degree Level MS Electrical Engineering
- Total Years of Experience 8
- Expected Job Level Managerial
Confident and motivated Electrical Engineer, Eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of design and maintenance in electrical, MEP and building systems. Motivated to learn, grow and excel in engineering industry.
Education
- Riphah International University MS Electrical Engineering
-
rnrn
· rnThesisrnTopic " Economic Dispatch in Microgrid with the integration of RenewablernEnergy Sources (Solar and Biogas)"
rnrn
Work Experience
- Outfitters Pvt limited - Lahore, Pakistan Deputy Manager MEP Projects
-
rnrn
· rnConductingrnDue diligences and developing scope work with coordination of stockholdersrn(design and Execution teams)
rnrn
· rnEvaluatingrnconsultant's MEP design and scope of work
rnrn
· rnPreparingrnof engineering estimates and evaluation of contractor's bids
rnrn
· rnConductingrnperiodic site visits for evaluating quality standard and specification
rnrn
· rnValidatingrnthe scope as per the contract agreement
rnrn
· rnTestingrncommissioning and energizing the complete MEP system for smooth operationsrnprior to project completion and handing over
rnrn
· rnPreparingrnand verifying snag lists while adhering contractor to comply and complete snagrnitems
rnrn
· rnDevelopmentrnof Asset list with respect to OFM items at the time of hand over along with allrntesting and commissioning reports
rnrn
· rnReviewingrnof Vos and checking/auditing final bill at the time of projects completion
rnrn
- Ideas by Gul Ahmed Pvt limited - Lahore, Pakistan Assistant Manager Projects MEP
-
rnrn
· rnConductrnKickoff Meetings of Projects with All Stake holders at site
rnrn
· rnReviewrnOFM List of Projects and coordinate with procurement team to ensure MEPrnmaterial deliveries as per given timelines
rnrn
· rnFacilitaternproblem solving, as may arise, between MEP Subcontractors during construction
rnrn
· rnLogrnand post all MEP changes and as-built information on field drawings
rnrn
· rnInitiaternscope of work, budgeting and justification of MEP Variation order
rnrn
· rnDirect,rnmonitor and control the activities of MEP Subcontractor
rnrn
· rnCoordinationrnand administration of MEP related materials and shop drawings submittals
rnrn
· rnConductrnInspection of Electrical DB's and ATS at panel manufacturer before delivery atrnsite
rnrn
· rnEnsurernthat MEP Subcontractors provides relevant Quality documentation and conductrnHVAC copper pressure test, drain test, hydrostatic test, Earth resistancerntesting, Meggar testing, Db's Load balancing Report, Fluke test, fire alarmrnsystem test
rnrn
· rnExecuterntesting and commissioning of MEP equipment
rnrn
- Kafalat Consulting Pvt Ltd - Pakistan Assistant Maintenance Engineer/Jr. Engineer
-
rnrn
· rnConductedrninspections and skilled repairs on Electrical, HVAC and plumbing systems,rnensuring their optimal functionality for a modern five-star hotel building
rnrn
· rnCarriedrnout scheduled maintenance and inspections on electrical infrastructure,rnincluding contactors, control switches, relays, instrumentation controlrnequipment and electrical panels
rnrn
· rnConductedrnmaintenance on HVAC equipment such as AHU's, DFCU's, VFD inverters, circulationrnmotors of chillers, industrial blowers, and electromechanical systems
rnrn
- Unicorn prestige Ltd - Lahore, Pakistan Project Engineer MEP
-
rnrn
· rnSupervisedrnelectrical wiring installation and system commissioning in commercial building includingrnPower, Ethernet/ IP system networks, and Security and communication systems
rnrn
· rnGeneratedrnestimates and bill of materials from electrical AutoCAD Drawings
rnrn
· rnWorkedrnwith IEC standards and customer specifications to ensure project installationrnof distribution box, cable trays, meters, sockets, cable sizing and cablernrouting
rnrn
· rnAssistrnin Plant room Erection of 2 MW Load with Electrical HT Panels, LT panels/syncrnPanel, circulation Pumps installation, Instrumentation control, VFD's andrnSystems grounding
rnrn
· rnAssistrnin the testing and commissioning of 1250 KVA ,415V Genset
rnrn
· rnCoordinatedrnwith consultants, Architects, and other stakeholders
rnrn
· rnPreparernTechnical documents and ensure that the work was carried in accordance torndrawings and specifications
rnrn
- Innovative PVT Ltd Electrical Engineer
-
rnrn
· rnProvidedrnEngineering Services on, Installation and Troubleshoot of “Wincor Nixdorfrn“American company Banks Automated Teller Machines ATM, (hardware &rnsoftware)
rnrn
· rnInstallationrnand troubleshoot of 3 KVA, 5KVA, 10KVA American Power company (APC) Brand UPS
rnrn